Showing posts with label Ordu Giresun Airport Starting Servicing. Show all posts
Showing posts with label Ordu Giresun Airport Starting Servicing. Show all posts

Friday, May 22, 2015

Ordu-Giresun Airport:A Dream Became True

Foundation on July 24, 2011, for common use of Giresun and Ordu thrown and so far 36 million tons of stone pouring sea in the middle of 7-mile filling fortifications made the 3-kilometer track with Ordu-Giresun Airport, President Recep Tayyip Erdogan and Prime Minister Ahmed Davutoglu by May 22, 2015 Friday Opening day of service.

More information:

Location of airport in Turkey
Summary
Airport typePublic/Civil
OwnerDHMI
OperatorState Airports Administration (TurkishDevlet Hava Meydanları İşletmesi (DHMİ))
ServesOrdu and Giresun
LocationGülyalı
Elevation AMSL5.5 m / 18 ft
Coordinates40°58′00″N 38°04′00″E
Runways
DirectionLengthSurface
mft
3,0009,842Concrete/Asphalt
Ordu-Giresun Airport (IATA: OGUICAO:LTCB) (Turkish: Ordu-Giresun Havalimanı) is an airport on an artificial island just off the coast of Gülyalı, a town in Ordu Province,Turkey and Piraziz, a town in Giresun Province, Turkey. It is located 16 km (9.9 mi) away from Ordu and 29 km (18 mi) from Giresun city centres. The airport project started on 13 July 2011 and is planned to finish by May 2015. The airport is being built in Gülyalı on a reclaimed land from sea and will have a 3000mx45m runway and a 36500 m² terminal building. The airport will serve Ordu and Giresun

🔥Tragic Malaysian Navy Helicopter Collision

Photocredit:RT Two helicopters collided en route to the Malaysian Navy's 90th-anniversary celebrations, resulting in 10 fatalities. Inve...